Thanks for the info. This is a repeatable issue. It happens every time I upload a Zoom meeting video. I need a solution to this.
One idea I had was to split the source video into separate video and audio files, before loading into VP. This should reduce the work intensity for VP. I used Audacity to do this, creating an MP3 file.
When I imported the original AV file (MP4) and the audio file to compare, you can see that at the very start of the timeline,
- the AV is out of sync by 1 second after 14 seconds of the file. https://i.imgur.com/w85HWWy.png
At the end of the timeline, it is more interesting.
- The AV audio has differed in its offset, and by 37:46, it was down to 2 seconds ahead.
- The AV was not imported correctly into VP, because it is a total length of 37:46, instead of the actual source video length of 38:14
- The audio of the AV file is truncated to match the length of the video in the project.
- The audio file is correctly 38:14 in length, matching the length of the source file.
https://i.imgur.com/nmv1a46.png
So it seems the problem lies in the import of the video file, not the editor itself.