Hi Sam
Thanks for your reply. After checking a little more I can happily concede that you are correct in saying that a copy is made of the stabilized file with the addition of "-stabilized"
I originally couldn't find it as I had forgotten that I had changed the destination folder for these - I used to use the desktop. (Doh!) So that part is OK.
However there is still a problem... The original unstabilized clip that was loaded to the clip bin IS replaced by the stabilized version without prompting and moreover it retains the original name..... "-stabilized" is not added! I don't think think this should happen at all...see below...
To check this behaviour....
Load a suitable clip to VP e.g. "Shaky.avi" but make a copy "Shaky-copy.avi" and load that as well.
Stabilize "Shaky.avi"
After conversion you will see the "Shaky.avi" bin clip reload. Presumably being overwritten. BUT... It will retain it's original name so you can't distinguish that it has been changed. This is a mistake as it really ought not to do this. In effect you lose the original clip from the bin which shouldn't happen. Also as editor, the decision to overwrite a clip should be left to the user.
Looking in the default destination folder you should find "Shaky-stabilized" as you correctly say. :-)
In order to see that this overwrite has been made you can now compare the clips in the bin by placing them on the timeline....you will see that "Shaky" and it's copy are no longer the same......"Shaky" has been stabilized.
I feel what should happen is that the stabilzed clip (with its new name) should be placed in the bin as a separate clip and that the original clip is not overwritten. It would be quite easy to make the replacement directly on the timeline after reviewing both clips.
This test was done before anything was placed on the timeline but the same thing happens If the clip in question is already there, it also is replaced on the timeline.
Nat